Custom Design

From Discovery & Design to Estimation

Schedule A Consultation
Modern outdoor patio with a shaded seating area, a wall-mounted TV, decorative plants, and ambient lighting, enclosed by a brick wall and wooden fencing.
Outdoor patio with a white concrete planter filled with snake plants, a wooden fence with a planter box on top, and a white fire pit in the foreground. There are also decorative plants and string lights in the background.

Crafting Outdoor Spaces That Reflect Your Lifestyle

Your outdoor space should be as unique as you are. At Pacific Breeze Landscape, we specialize in custom design services that transform your vision into a luxurious, functional outdoor environment. Whether you’re planning a new pool, an outdoor kitchen, or a full landscape makeover, our design team ensures every detail complements your home and enhances your outdoor living experience.

Our approach is guided by creativity, precision, and over 20 years of expertise in luxury landscape design. From the first consultation to the final estimate, every step is handled with care to make your dream space a reality.

PROCESS DETAILS

Consultation & Design Process

Great design starts with understanding your goals, preferences, and property layout. Our team listens closely to your ideas and brings them to life through a transparent and collaborative process.

Here’s how our custom design process works:

Man measuring the distance between garden flowers near a swimming pool on a sunny day.

Our experts conduct a detailed walkthrough of your outdoor space to understand its layout and potential. We take precise measurements and discuss your preferences for layout, style, and function.

During this step, we:

  • Evaluate your property’s features for cohesion

  • Discuss your goals, design preferences, and project priorities

  • Gather all the necessary details for an accurate design

Step 1: On-Site Assessment

A computer monitor displays architectural design plans and renderings on a white desk with a keyboard, mouse, laptop, notebook, coffee mug, pen holder, and potted plant. In the background is a bookshelf with binders.

Next, we turn your ideas into visual concepts you can see and refine. Our designers create both 2D layouts and 3D renderings, helping you visualize how your new landscape, pool, or outdoor living area will look before construction begins.

You’ll be able to:

  • Review different design options

  • Suggest changes or enhancements

  • Approve the final concept with confidence

Step 2: Concept Development

A laptop placed on a gray surface next to a colored architectural floor plan drawing.

Once the concept is approved, our team prepares construction-ready documents that ensure your project moves smoothly into the build phase.

This includes:

  • Detailed design blueprints and measurements

  • Submissions for HOA or engineering approvals

  • Documentation needed to pull permits efficiently

Every plan is crafted to align with local regulations and built to the highest standards of quality and safety.

Step 3: Design Completion

A project timeline or Gantt chart showing dates and tasks in a spreadsheet format with colored bars representing different activities or phases.

After completing the design, we provide a precise and accurate project estimate. This includes:

  • Material and labor breakdowns

  • Optional feature upgrades

  • Timeline expectations for project completion

Our transparent pricing ensures you can plan with confidence—no hidden costs, just honest and detailed estimates.

Step 4: Project Estimate

Why Choose Pacific Breeze Landscape?

At Pacific Breeze Landscape, we combine design expertise with practical construction knowledge to ensure your project looks exceptional and functions perfectly. Whether it’s a modern backyard design or a complete outdoor transformation, we tailor every plan to your vision, property, and lifestyle.

Start Your Custom Design with Pacific Breeze Landscape!

Bring your outdoor vision to life with a custom design from Pacific Breeze Landscape. Our design specialists are ready to help you plan, visualize, and estimate your next outdoor project.

Contact us today to schedule your consultation and take the first step toward your dream outdoor space.

Schedule A Consultation